walton web banner 2 20161024

Draft Work-In-Progress Comprehensive Element Updates – Infrastructure Elements

Click below to view the Draft Work-In-Progress Stormwater Infrastructure Sub-Element (formerly Drainage Sub-Element) and the Draft Work-In-Progress Solid Waste Infrastructure Sub-Element. These Comprehensive Plan updates will be scheduled before the Board of County Commissioners for approval to transmit to the State Department of Economic Opportunity for state agency review at an upcoming public hearing.       

Stormwater Management Infrastructure Sub-Element (formerly the Drainage Infrastructure Sub-Element) 

Solid Waste Infrastructure Sub-Element

article spacer

Copyright © 2016, Matrix Design Group, Inc. All Rights Reserved.
Website designed and hosted by Matrix Design Group.
Join eMail List
Send Comments
1000 characters left